Sign in
10YRSZhongshan Baro Metal Products Co., Ltd.

Descripción de la compañía

Álbum de la compañía

Información básica

Control de Calidad

Proceso de control de calidad

The blasting test
The bursting test is performed prior to refueling to ensure that the cylinder can withstand a pressure of at least 70MPa or more
The water temperature test
The water temperature test is carried out after the gas cylinder is filled. After the test, the gas cylinder can not be broken or deformed.
The weighing test
The weighing test is done before the goods are packed.

Capacidad de I+D

R & D PROCESO DE

Customized bottle
According to the customer's different industry design of different specifications of special cylinders

Investigación & Desarrollo

5 - 10 People